Bashford, H H, Walsh, K D and Sawhney, A (2005) Production System Loading–Cycle Time Relationship in Residential Construction. Journal of Construction Engineering and Management, 131(01), 15–22.

Chen, Z, Li, H and Wong, C T C (2005) {[}EnvironalPlanning{]}: Analytic Network Process Model for Environmentally Conscious Construction Planning. Journal of Construction Engineering and Management, 131(01), 92–101.

Chester, M and Hendrickson, C (2005) Cost Impacts, Scheduling Impacts, and the Claims Process during Construction. Journal of Construction Engineering and Management, 131(01), 102–7.

Dzeng, R J, Tserng, H P and Wang, W C (2005) Automating Schedule Review for Expressway Construction. Journal of Construction Engineering and Management, 131(01), 127–36.

  • Type: Journal Article
  • Keywords: Highway construction; Scheduling; Construction management; Automation;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2005)131:1(127)
  • Abstract:
    An expressway project is often divided into subprojects with different tendering packages, and carried out by several general contractors that apply different scheduling practices. Each schedule may contain hundreds of activities, each of which is associated with multiple pay items that determine its earned monetary value. With such huge amount of information, the reviewer can only check a sample piece of information, and the quality of review highly depends on the reviewer’s experience and devotion. Automated schedule review provides a solution to reduce such problems encountered in the industry. This paper presents a module-based schedule generation and review model, which includes a predefined set of network modules, network builder assistant computer system that helps schedulers manage and reuse the modules to build a new schedule, and another computer system network review assistant (NRA) that helps reviewers review schedules. The NRA uses generalized rule forms to represent the schedule critique knowledge collected from the industry. When potential errors are found, the NRA adopts case-based reasoning to suggest possible correction based on similar cases. The evaluation conducted by the practitioners using real projects indicates that NRA reduces review time, and provides more accurate review on finding activities and related pay items not conforming to standards, and reminding users of important but often omitted activities.

Elazouni, A M, Ali, A E and Abdel-Razek, R H (2005) Estimating the Acceptability of New Formwork Systems Using Neural Networks. Journal of Construction Engineering and Management, 131(01), 33–41.

Horman, M J and Kenley, R (2005) Quantifying Levels of Wasted Time in Construction with Meta-Analysis. Journal of Construction Engineering and Management, 131(01), 52–61.

Kaiser, M J, Pulsipher, A G and Byrd, R C (2005) Cost of Abrasive Cutting in Decommissioning Operations in the Gulf of Mexico. Journal of Construction Engineering and Management, 131(01), 137–48.

Kaiser, M J, Pulsipher, A G and Martin, J (2005) Cost of Site Clearance and Verification Operations in the Gulf of Mexico. Journal of Construction Engineering and Management, 131(01), 117–26.

Oliveros, A V O and Fayek, A R (2005) Fuzzy Logic Approach for Activity Delay Analysis and Schedule Updating. Journal of Construction Engineering and Management, 131(01), 42–51.

Singh, D and Tiong, R L K (2005) A Fuzzy Decision Framework for Contractor Selection. Journal of Construction Engineering and Management, 131(01), 62–70.

Tatum, C B (2005) Building Better: Technical Support for Construction. Journal of Construction Engineering and Management, 131(01), 23–32.

Yiu, C Y, Ho, H K, Lo, S M and Hu, B Q (2005) Performance Evaluation for Cost Estimators by Reliability Interval Method. Journal of Construction Engineering and Management, 131(01), 108–16.

Zhang, X (2005) Critical Success Factors for Public–Private Partnerships in Infrastructure Development. Journal of Construction Engineering and Management, 131(01), 3–14.

Zhang, X (2005) Paving the Way for Public–Private Partnerships in Infrastructure Development. Journal of Construction Engineering and Management, 131(01), 71–80.

Zheng, D X M, Ng, S T and Kumaraswamy, M M (2005) Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization. Journal of Construction Engineering and Management, 131(01), 81–91.